Home ÅðéêïéíùíÜ Ðëïçãüò FAQ Switch to Greek
The Russian Channels Vesti and RTR Planeta now available on miVision!
Superleague Formula
What is miVision
Why subscribe
General Information about miVision
miVision Installation Instructions
miVision & i-choice Installation Instructions
Set-Top Box Connection Instructions
Basic Usage Instructions

View the miVision
Movie Guide

Movie Guide in Adobe Acrobat
Current customers will receive the movie guide my mail whereas new ones will receive it upon the installation of the service. A small quantity is also available at all cytashops.
  I-choice  

TV Channels

Movies

Live Transmission

TV-mail

Games

Inform. Portal
Modification of the customer premises wiring, before the installation of miVision service Print Version

Connection of the Set Top Box

In case there are several telephone outlets (sockets) on the telephone line where the ADSL modem will be connected, special filters will be provided by CYTA to be installed between the sockets and telephones.

Figure 1 shows the final wiring, after miVision service is installed by the CYTA's technical team.

Figure 1 Current customer premises wiring
Figure 1 New customer premises wiring after installation of miVision

Connection of the second Set Top Box

Figure 2 shows the wiring after the installation of miVision service by the CYTA's technical team. The second STB is connected directly to the modem using an Ethernet cable.

Figure 4 Customer premises wiring after miVision is installed over an ISDN line
Figure 2 Customer premises wiring after miVision 2nd STB is installed

CYTA's technical team will draw, using the existing internal telephone pipes or externally (using tracking), a twisted pair cable. This should end up to the room where the ADSL modem will be installed, in the TV room.

Copyright 2004 by CYTA miVision. All rights reserved.